Pave Spike Operations
Turn on
Step | Action | Button |
---|---|---|
1 | Ensure power to the aircraft (main AC bus and main DC bus) | |
2 | Ensure corresponding CBs are not pulled | No. 4 CB Panel, WSO left wall |
3 | POWER ON Button (WSO, Target Designator Set Control) | Press and confirm lamp lit |
4 | BIT 1 | Confirm MALF not lit |
5 | Video Select Switch | ASQ-153 (WSO, main panel) |
6 | DSCG Mode | TV (pilot or WSO) |
7 | Un-stow | Press STOW button and wait 5 seconds and confirm lamp off |
8 | Confirm DSCG on and displaying pod camera feed |