Pave Spike Operations
For more details, refer to chapter 3.12.6 Pave Spike.
Turn on
| Step | Action | Button |
|---|---|---|
| 1 | Ensure power to the aircraft (main AC bus and main DC bus) | |
| 2 | Ensure corresponding CBs are not pulled | No. 4 CB Panel, WSO left wall |
| 3 | POWER ON Button (WSO, Target Designator Set Control) | Press and confirm lamp lit |
| 4 | BIT 1 | Confirm MALF not lit |
| 5 | Video Select Switch | ASQ-153 (WSO, main panel) |
| 6 | DSCG Mode | TV (pilot or WSO) |
| 7 | Un-stow | Press STOW button and wait 5 seconds and confirm lamp off |
| 8 | Confirm DSCG on and displaying pod camera feed |