Pave Spike Operations

For more details, refer to chapter 3.12.6 Pave Spike.

Turn on

StepActionButton
1Ensure power to the aircraft (main AC bus and main DC bus)
2Ensure corresponding CBs are not pulledNo. 4 CB Panel, WSO left wall
3POWER ON Button (WSO, Target Designator Set Control)Press and confirm lamp lit
4BIT 1Confirm MALF not lit
5Video Select SwitchASQ-153 (WSO, main panel)
6DSCG ModeTV (pilot or WSO)
7Un-stowPress STOW button and wait 5 seconds and confirm lamp off
8Confirm DSCG on and displaying pod camera feed