Keyboard shortcuts

Press or to navigate between chapters

Press S or / to search in the book

Press ? to show this help

Press Esc to hide this help

Electrics

The Pave Spike draws its power through 4 circuit breakers on the No. 4 CB Panel (WSO, left wall). They forward current from the left main AC bus and the main DC bus.

All panels of the system are powered directly through the pod, and hence will be turned off if the Pave Spike targeting pod is not equipped.

💡 It is not required to turn on the pod itself in order for power to be routed through the pod to the panels.